wave graphic

Gateway West Commerce Park

Gateway West Commerce Park is a shovel-ready development, owned by Rutherford County and developed for high quality advanced manufacturing, automotive and technology opportunities. The 74-acre park was master-planned to develop a campus-like setting with more than 16 additional acres available for complementary commercial development. Over 12 acres are pre-graded and available to reduce time, risk and cost for your project. A state maintained road runs through the park creating convenient ingress and egress with two park entrances. Robust utilities are located within the park to meet a wide range of industry needs.      

Gateway West Commerce Park is strategically located adjacent to Isothermal Community College and is located within a one hour drive of Greenville, SC, Charlotte, NC and Asheville, NC. Convenient access to Greenville-Spartanburg International Airport and Charlotte Douglas International Airport easily connects you to the world.

NOTE: Every effort has been made to ensure the accuracy of the information provided below, however it should be independently verified.

PROPERTY INFORMATION
Park Size 90 Acres
Available - Pre-graded Site(s): 12 AC
- Shovel Ready Site(s): 62 AC
- Commercial Tract: 16 AC
*Can be sub-divided to
meet project needs
Zoning M-1 within City Limits
M-1 within ETJ
Current Land Use Industrial / Commercial
Elevation Maximum 1060 / Minimum 980
Terrain Type Pre-graded to
gently sloping / gently rolling
Environmental Studies - Phase I and Phase II ESA
- Subsurface Geotechnical
Exploration
- Jurisdictional Determination
- Endangered Species Survey
- Archaeological Review
*Reports available upon request
Price (Industrial sites only) $40,000 per acre; $52,000 per acre pre-graded site(s)
 
UTILITY INFORMATION
Utility Provider Description
Electric Duke Energy - 100kV electric transmission power line in the area
- 12.5kV 3 phase power line on site
Electric Town of Forest City Infrastructure available at site providing opportunities
for customer choice
Water Town of Forest City - 16” water main on Daniel Road
- Permitted Capacity of 8MGD
- Total available capacity of 4.38MGD
Sewer Town of Forest City - 10” sanitary sewer line along northern boundary of property with 270GPM capacity
Natural Gas Dominion Energy - 12” high pressure line
- Approximately 350 psi
Telecom AT&T  
Fiber AT&T 
and
PANGAEA
- AT&T: T-1 and Ethernet (Fiber)
- PANGAEA: redundant fiber connections are provided by dual routing from Charlotte and Atlanta with connectivity that is equivalent to that of most metropolitan areas
Fire Protection Town of Forest City 2.3 miles / 4 minutes from the site
 
TRANSPORTATION
Daniel Road State Road runs through park
US 74 Less than 3 miles (via US 74-ALT)
I-85 30 miles (via US 221)
I-26 22 miles (via US 74)
I-40 25 miles (via US 221)
Rail N/A
Rutherford Municipal Airport 8.5 miles (via US 74-ALT)
Greenville-Spartanburg International Airport 46 miles
Charlotte Douglas International Airport 61 miles

 

Gateway West Commerce Park Flyer - Industrial
Gateway West Commerce Park Flyer - Commercial

Conceptual Development Plans:
Gateway West Concept 1Gateway West Concept 2