Gateway West Commerce Park
Gateway West Commerce Park is a shovel-ready development, owned by Rutherford County and developed for high quality advanced manufacturing, automotive and technology opportunities. The 74-acre park was master-planned to develop a campus-like setting with more than 16 additional acres available for complementary commercial development. Over 12 acres are pre-graded and available to reduce time, risk and cost for your project. A state maintained road runs through the park creating convenient ingress and egress with two park entrances. Robust utilities are located within the park to meet a wide range of industry needs.
Gateway West Commerce Park is strategically located adjacent to Isothermal Community College and is located within a one hour drive of Greenville, SC, Charlotte, NC and Asheville, NC. Convenient access to Greenville-Spartanburg International Airport and Charlotte Douglas International Airport easily connects you to the world.
NOTE: Every effort has been made to ensure the accuracy of the information provided below, however it should be independently verified.
NOTE: Every effort has been made to ensure the accuracy of the information provided below, however it should be independently verified.
PROPERTY INFORMATION | |
Park Size | 90 Acres |
Available | - Pre-graded Site(s): 12 AC - Shovel Ready Site(s): 62 AC - Commercial Tract: 16 AC *Can be sub-divided to meet project needs |
Zoning | M-1 within City Limits M-1 within ETJ |
Current Land Use | Industrial / Commercial |
Elevation | Maximum 1060 / Minimum 980 |
Terrain Type | Pre-graded to gently sloping / gently rolling |
Environmental Studies | - Phase I and Phase II ESA - Subsurface Geotechnical Exploration - Jurisdictional Determination - Endangered Species Survey - Archaeological Review *Reports available upon request |
Price (Industrial sites only) | $40,000 per acre; $52,000 per acre pre-graded site(s) |
UTILITY INFORMATION | ||
Utility | Provider | Description |
Electric | Duke Energy | - 100kV electric transmission power line in the area - 12.5kV 3 phase power line on site |
Electric | Town of Forest City | Infrastructure available at site providing opportunities for customer choice |
Water | Town of Forest City | - 16” water main on Daniel Road - Permitted Capacity of 8MGD - Total available capacity of 4.38MGD |
Sewer | Town of Forest City | - 10” sanitary sewer line along northern boundary of property with 270GPM capacity |
Natural Gas | Dominion Energy | - 12” high pressure line - Approximately 350 psi |
Telecom | AT&T | |
Fiber | AT&T and PANGAEA |
- AT&T: T-1 and Ethernet (Fiber) - PANGAEA: redundant fiber connections are provided by dual routing from Charlotte and Atlanta with connectivity that is equivalent to that of most metropolitan areas |
Fire Protection | Town of Forest City | 2.3 miles / 4 minutes from the site |
TRANSPORTATION | |
Daniel Road | State Road runs through park |
US 74 | Less than 3 miles (via US 74-ALT) |
I-85 | 30 miles (via US 221) |
I-26 | 22 miles (via US 74) |
I-40 | 25 miles (via US 221) |
Rail | N/A |
Rutherford Municipal Airport | 8.5 miles (via US 74-ALT) |
Greenville-Spartanburg International Airport | 46 miles |
Charlotte Douglas International Airport | 61 miles |
Gateway West Commerce Park Flyer - Industrial
Gateway West Commerce Park Flyer - Commercial