RiverStone Business Park
RiverStone is a shovel-ready development, developed for high quality advanced manufacturing and distribution opportunities. Phase I is comprised of more than 400 acres of shovel-ready sites that can be subdivided to meet your project needs. Approximately 10 acres have been pre-graded to reduce time, risk and cost for your project. Robust utilities are located within the park to meet a wide range of industry needs. RiverStone is strategically located on US 221 within 15 miles of I-85 and a one hour drive of Greenville, SC, Charlotte, NC and Asheville, NC.
NOTE: Every effort has been made to ensure the accuracy of the information provided below, however it should be independently verified.
NOTE: Every effort has been made to ensure the accuracy of the information provided below, however it should be independently verified.
PROPERTY INFORMATION | |
Park Size | 1,000 AC, split into 3 Phases: - Phase 1 – 391 AC - Phase 2 – 432 AC - Phase 3 – 160 AC |
Available | Phase 1 available for development – Call for details |
Current Land Use | Restrictive covenants in place |
Elevation | Varies by site Phase 1 – Maximum: 900, Minimum: 720 |
Terrain Type | Phase 1 – Pre-graded to greatly sloping / greatly rolling |
Environmental Studies | Phase 1 – Phase I Environmental and Geotechnical Study |
Price (Industrial sites only) | Starting at $10,000/acre |
UTILITY INFORMATION | ||
Utility | Provider | Description |
Electric | Duke Energy | - 45 kw substation in the park - 12.5kV 3-phase primary line - Dual-feed electrical service option - Existing transformer 24,000 Kva |
Water | Town of Forest City | - Residual Pressure: 70 psi - Total System Capacity: 1500 mgd - Total Permitted Capacity: 1500 mgd |
Sewer | Town of Forest City | - Main Size: 12” in - Feeder Size: 8” in - Total Capacity: 5 mgd - Excess Capacity: 2 mgd - Total Permitted Capacity: 5 mgd *Expandable to 200,000 gpd |
Natural Gas |
Dominion Energy | 8” Main |
Telecom | AT&T | |
Fiber | AT&T | |
Fire Protection | SDO and Sandy Mush Fire Departments |
TRANSPORTATION | |
US 221 | 0.5 miles |
I-85 | 15 miles (via US 221) |
I-26 | 23 miles (via US 221 and I-85) |
Rail | CSX runs along the western border of Phase I (Sites 7 & 14) |
Rutherford Municipal Airport | 18.5 miles |
Greenville-Spartanburg International Airport | 37 miles |
Charlotte Douglas International Airport | 61 miles |